Dad and I are talking to the plumber as his crew is packing up for the day. They still have to run a water test on the water and sewer lines to make sure there are no leaks, but that will be done the next day.
Here I am walking the forms with the plumber.
You can almost see down one of the trenches in the dirt work. This is called a grade beam, and they run in a grid thru the slab. Concrete fills these beams as the slab is poured, giving the slab added strength.
Plumbers working on the plumbing rough. The neighbor's house in the background serves as a great landmark for directions, as it is the only house in the neighborhood with a blue metal roof.