Hopefully next weekend we will have all countertops installed, wall and floor tile completed (though I'm not holding my breath), the phone and TV cables run to the house, the sewer connected, and the driveway and sidewalks at least set up, if not poured. The stamped concrete patio is scheduled for 11/20.
Thanksgiving weekend is going to throw a kink in the schedule, so as a result, the house may finish on December 8th instead of December 1st. We'll just have to see how it play's out.
Until next week fellas, let's quote the Man's Prayer together from The Red Green Show. "I'm a man...But I can change...If I have to...I guess."
Amen.
No comments:
Post a Comment